ProppFrexx Advertising
Posted: 22 Jun 2026 18:11
Hi Bernd,
We are noticing that in our ProppFrexx advertising schedule, not all planned campaigns are actually being played in the correct ad breaks.
Context:
Ad breaks run through overlays such as 07u20, 07u40, 08u20, etc... (2 slots per hour, from 7 in the morning till 7 at night - day recurrence 1 playout)
The campaign schedule appears to be correct in the dynamic.cfg files.
The overlays are usually processed, but the actual playout sometimes contains fewer or different spots than expected.
So there seems to be a difference between what is “scheduled” and what is actually selected by the advertising engine.
Which has been a problem with our customers who get a report from us, after we planned the commercials - they don't hear there adds at the time it's stated in the order confirmation report.
Could you please check:
Why ProppFrexx does not play all scheduled campaigns from dynamic.cfg in a processed ad break.
Whether settings such as Random=True, EnsureMinLength=False, MaxPerHour, campaign counters, or the advert library state cause campaigns to be skipped at runtime.
Whether dynamic.cfg is used as a fixed schedule, or only as input for runtime selection.
In slot management, i can see how many campaigns are planned in a slot - but the play time is there 0:03 seconds.
We are also considering playing ad breaks as fixed playlists/containers (pls format), so we can determine exactly which spots should run in each break. Could you advise whether this would be the best approach, or whether the current advertising engine can be configured more accurately?
I can't find a lot of information about ProppFrexx Advertising, except for a video where 2 slots where configured (morning and evening).
Thanks in advance for looking into this.
We are noticing that in our ProppFrexx advertising schedule, not all planned campaigns are actually being played in the correct ad breaks.
Context:
Ad breaks run through overlays such as 07u20, 07u40, 08u20, etc... (2 slots per hour, from 7 in the morning till 7 at night - day recurrence 1 playout)
The campaign schedule appears to be correct in the dynamic.cfg files.
The overlays are usually processed, but the actual playout sometimes contains fewer or different spots than expected.
So there seems to be a difference between what is “scheduled” and what is actually selected by the advertising engine.
Which has been a problem with our customers who get a report from us, after we planned the commercials - they don't hear there adds at the time it's stated in the order confirmation report.
Could you please check:
Why ProppFrexx does not play all scheduled campaigns from dynamic.cfg in a processed ad break.
Whether settings such as Random=True, EnsureMinLength=False, MaxPerHour, campaign counters, or the advert library state cause campaigns to be skipped at runtime.
Whether dynamic.cfg is used as a fixed schedule, or only as input for runtime selection.
In slot management, i can see how many campaigns are planned in a slot - but the play time is there 0:03 seconds.
We are also considering playing ad breaks as fixed playlists/containers (pls format), so we can determine exactly which spots should run in each break. Could you advise whether this would be the best approach, or whether the current advertising engine can be configured more accurately?
I can't find a lot of information about ProppFrexx Advertising, except for a video where 2 slots where configured (morning and evening).
Thanks in advance for looking into this.