Scheduler recurrence
Posted: 26 Jun 2023 12:12
Hi,
We have a scheduler problem and i can't find a clean way to solve it.
For example, we plan an event that have multiple occurences in the same week. Lets say monday, friday and sunday and need a reccurence each second week of month. I can't schedule it on every second monday/friday/sunday of the month, because the events will mostly be scheduled on different weeks.
Is there a way to group events and be sure that the whole groupe is sheduled on the same week ?
Thanks,
Fred